Skip to main content

Vacation house near the city of Varna

Тwo-story monolithic house of brick and concrete construction, located in Varna district. It is finished and equipped at turnkey stage. It has a total living area of 88 sq m and comes with adjoining plot of 632 sq m.

The house can be used all year round and has all necessary living conditions – supplied with water and electricity.

The property is located 500 meters from a large gated apartment complex and 80 meters from the last house in the nearby village. The main road is 70 meters from the house. The distance from Varna to the property is 33 km.

The house has three floors with the following distribution inside:

  • Basement - large room (5.70 x4.45 meters).
  • First floor – one room with a kitchenette (5.70x4.45 meters) and a terrace (1.20x1.40 meters).
  • Second floor - one room with slight ceiling slopes (5.70x4.45 meters) + terrace (1.20x5.70 meters).
  • External toilet - 1.50x2.20 meters

Over the past few years, the house was generally repaired and a lot of things were replaced. Sold ready to move in.



ID: 16647
Property Status:  Available
Contact us in regards to this property

District:  Varna
Price Euro:  €36,000
Price GBP:  £31,298
Price USD:  $40,183
Category:  Houses
Area :  3 Floors
Bedrooms: 2 Bedroom
Living area: 88 m 2
Plot Size :  632m 2
Extras:  Electricity, Water
Location:  Near the sea
Published:  Thursday, April 27, 2023
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

Danube bridge 2 will be opened by the end of 2011 02/10/2009
The construction of Danube Bridge, which is being built by a unique technology, is delaying and will most probably be lounged by the end of 2011. This is what Konstantin Zhiponov, the director`s substitute on the project for Danube Bridge 2- the engineer for the bridge on the behalf of the... more
 
The Metro station next to airport Sofia will be ready earlier 10/12/2013
The Metro station, which is being built next to Terminal 2 at Sofia Airport will be an early finish. Currently, 70% of the station is built. It is expected the work on the infrastructure activities to end entirely at the end of January 2014. "If the winter is on our side, all construction... more