Skip to main content

Property for sale near Lovech

The property is located Lovech region, 20 minutes from Lovech and 15 minutes from Pleven. It is also 1500 meters from the highway Hemus.

The property is near the center of the village. It comprises of two residential buildings. The newer house is concrete and brick built. It has three floors. The first floor consists of a basement, a corridor, a separate room used for a tavern. The second floor has a dining room with large terrace, a bedroom with a bathroom and a terrace. The second floor consists of a bedroom with a bathroom and a large terrace. The third floor has a bedroom and attic premises.

The older house is on one floor. It was built around 1950 and has an area of ​​about 50 square meters. There is supplied with electricity and there is a fountain in front of it.

The garden is planted with fruit trees. In the yard there is a solid farm building made of concrete and brick. The total land area is 1600 square meters.



ID: 15510
Property Status:  Sold
District:  Lovech
Price Euro:  €44,500
Price GBP:  £38,804
Price USD:  $49,671
Category:  Houses
Area :  3 Floors
Bedrooms: 3 Bedroom
Living area: 100 m 2
Plot Size :  1,630m 2
Extras:  Electricity, Water
Location:  In the countryside
Published:  Thursday, December 23, 2021
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

New Vacation Property Projects Launched In Bulgaria 12/03/2008
More than four million sq m of vacation property are being constructed or planned in Bulgaria's resorts. In Blagoevgrad region, where the resorts of Banko, Razlog and Dobrinishte are situated, construction of more than a million sq m of vacation property was planned or launched, Yavlena... more
 
Complete rough construction of Mall Pleven and 44 percent of the land are leased 18/10/2009
Construction of the rough stage of the Mall of Pleven is finished. It is expected in the coming months that the engaged in carrying out construction site people will reach 700 and over 85% of the overall performance will be carried out by the end of January 2010, final completion of construction... more