Skip to main content

Renovated house for sale near Elena

This is a lovely, two-storey house located in a village 12 km east from Elena. The property stands on a main asphalted road near its center.

The house is built on a plot of land with area 1265 sq m. Its total living area is 160 sq m. The house has stone foundations, brick walls and wooden roof structure. On the first floor, there is a tavern, a room and a toilet with a sink. On the second floor - large corridor, large bathroom with toilet and three rooms.

The property has been fully renovated. It benefits with wood floor covers, ceilings - wooden cladding. There is central sewerage. The house is isolated and is plastered. The roof was also repaired.

The heating is via fireplace with a water jacket, connected with radiators in each room, and the boiler in the bathroom. The house is perfectly maintained and you can move in without any additional repairs.

The yard is also well maintained. It comprises with separate vegetable, flower and fruit gardens. There are also additional farm buildings in good condition. The whole property is surrounded with a fence.



ID: 12001
Property Status:  Sold
District:  Elena
Price Euro:  €46,900
Price GBP:  £40,775
Price USD:  $52,350
Category:  Houses
Area :  2 Floors
Bedrooms: 3 Bedroom
Living area: 160m 2
Plot Size :  1,265m 2
Extras:  Electricity, Water
Location:  In the mountains
Published:  Sunday, August 16, 2020
 

Contact us in regards to this property

 
 

 
 

SIMILAR PROPERTIES

 
 

Bulgarian Property News

New Winter Complex Opened In Bulgarias Samokov 10/03/2008
A new winter complex will be officially opened in the Southern Bulgarian town of Samokov on January 12 2008. The complex, called Boricho, has been functioning since January 4, a Samokov municipality media statement said. Boricho had an opened chair-lift and a ski-run of one km, investor.bg... more
 
The Metro station next to airport Sofia will be ready earlier 10/12/2013
The Metro station, which is being built next to Terminal 2 at Sofia Airport will be an early finish. Currently, 70% of the station is built. It is expected the work on the infrastructure activities to end entirely at the end of January 2014. "If the winter is on our side, all construction... more